NQ FaBRICATION AND FOOTINGS

NQ FaBRICATION AND FOOTINGS

NO CONCRETE, NO DELAYS THE SMARTER FOUNDATION

This Australian-designed system uses a steel cap supported by angled micro piles that spread out like a root system, anchoring the structure with remarkable strength and minimal soil disturbance. The result is a stable, high-capacity footing that performs across all ground types, soil types and gradients.

Surefoot’s products have versatile applications, from light residential use such as fence and deck footings, to providing robust building foundations on sloping sites, providing secure cyclone tie down points, concrete slab base, roadside sign footings and more. It’s been used to re-stump Queenslanders, secure bridges and boardwalks in national parks, and stabilise buildings on rocky slopes and in remote locations. Built with premium-grade steel and enhanced corrosion resistance, each footing is certified, independently tested and backed by a 50+ year design life. Explore the full Surefoot range below and click through for specifications direct from the manufacturer.

A SUSTAINABLE SOLUTION.

SUREFOOT PILECAP S150

  • Load CapacityUp to 25kN
  • Bolt Pattern 147mm x 3 x 16mm Holes
  • Mini Piles25mm NB 33.7 x 2.6mm thick
  • Average install time10 minutes
More Info

SUREFOOT PILECAP T150

  • Load Capacity Up to 35kN
  • Bolt Pattern 147mm x 3 x 16mm Holes
  • Micro Piles 3 x 32NB (Nominal Bore) 42.4OD Galvanised Pipe Light, Medium, Heavy
  • Average install time 10 minutes
More Info

SUREFOOT PILECAP S250 3W

  • Load Capacity: Up to 75kN
  • Bolt Pattern: 140mm centres x 4 x 22mm holes OR 120mm centres x 4 x 18mm holes
  • Micro Piles: 4 x 32NB (Nominal Bore) 42.4OD Galvanised Pipe Light, Medium, Heavy
  • Average Install Time: 10 minutes
More Info

SUREFOOT PILECAP S250 4P

  • Load Capacity: Up to 75kN
  • Bolt Pattern: 140mm centres x 4 x 22mm holes
  • Micro Piles: 4 x 32NB (Nominal Bore) 42.40D | Galvanised Pipe Light, Medium, Heavy
  • Average Install Time: 10 minutes
More Info

SUREFOOT PILECAP S250 8P

  • Load Capacity: Up to 100kN
  • Bolt Pattern: 140mm centres x 4 x 22mm holes OR 120mm centres x 4 x 18mm holes
  • Micro Piles: 4 x 32NB (Nominal Bore) 42.40D | Galvanised Pipe Light, Medium, Heavy
  • Average Install Time: 10 minutes
More Info

SUREFOOT PILECAP S400 12P

  • Load Capacity: Up to 200kN
  • Bolt Pattern: 198–250 PCD x 4 x 22mm holes OR 300–350 PCD x 4 x 26mm holes
  • Micro Piles: 6 x 32NB (Nominal Bore) 42.4OD | Galvanized Pipe Light, Medium, Heavy
  • Average Install Time: 15 minutes
More Info

SUREFOOT PILECAP S600 16P

  • Load Capacity: Up to 300kN
  • Bolt Pattern: 350–400 PCD x 4 x 26mm holes OR 432–500 PCD x 4 x 32mm holes
  • Micro Piles: 16 x 32NB (Nominal Bore) 42.4OD | Galvanised Pile Light, Medium, Heavy
  • Average Install Time: 40 minutes
More Info

SUREFOOT CONNECTIONS

The Surefoot Concrete Free Footing System includes a range of connections, made with high grade materials to deliver robust performance in all soil conditions and environments. This includes cyclonic wind, coastal and marine environments.

More Info

FABRICATION AND INSTALLATION

NQ Fabrication and Footings is experienced with all aspects of the installation and preparation required for the Surefoot system. We can also assist with stumping and levelling, as well as smaller fabrication on site and boilermaker services.

Contact Us

© NQ Fabrication and Footings 2025

Website created by RJ New Designs